Alick's Unofficial CMS pixels info webpage

epp_line.gif (2537 bytes)

DCS+DSS Controls Mechanics/Beampipe
Cabling and Service Tube Readout  Irradiation
People Testbench Photos

CMS Pixels TDR

PSI Pixels page: (Danek Kotlinski)

 Rutgers FWD Pixel Page (Ed Bartz)
Technical Coordination Presentations

Cabling and Service Tube

  • Peter Robmann's  layout for the barrel Service tube (3/06/2003). Click here

  • Latest cabling assignment 20/05/2001

  • Controls (and Opto links)

  • Pixel Opto-links presentation for CMS Electronics week (15/5/2002) PDF

  • Draft of Pixel Control Lines document - Version 1.2 (19/4/2002) PDF

  • Automatic Gain Control for Opto Receiver - Pixel Readout Workshop - 19/03/2002 PDF

  • Optolinks Discussion (F Vasey) 25/09/2001

  • Webpage for the RX40 optical receiver developed for the digital optical link of the CMS Silicon Strip Tracker. Includes reference and technical manual,  and measurement report

  • DCS+ DSS : CMS DCS webpage

  • Pixel DCS - Pixel Readout Workshop - 18/03/2002 PDF

  • DCS day - March 2002 - 01/03/2002 PDF

  • DCS meeting - April 2001 - 24/04/2001 PDF

  • DCS day - October 2000 -   04/10/2000 PDF

  • DCS day - October 1999 -  28/10/1999 PDF

  • Irradiation

  • East Hall One shot irradiation proposal. An attempt to kill silicon detectors. 12/04/2002

  •  Irradiation Proposal for PSI41 chips

  • SEU measurements with PSI pion beam 25/05/00

  • Mechanics/Beampipe

    Readout

  • Andre's readout workshop presentation on the PSI41 chip performance. 18/03/2002

  • The 2nd Pixel Readout Workshop held at PSI, 18th and 19th March 2002

  • The electrical performance review 15/5/2001

  • FED Counting 12/2002

  • FEC Counting 10/01/2002

  • Presentations

    • Lehman Review 2003. Click here

    • Pixel General Meetings  Click here

    • 4th Pixel Workshop- PSI  22nd -26th October 2004 Click here

    • Lehman Review 2002. Click here

    • Bruno Gobbi's FPix presentation at the July 2002 Tracker week

    Technical Coordination

  • Link to TCM agenda  and minutes 

  • Link to  TC Schedules and milestones. Current summary schedule for Underground area. V33

  • TestBench

  • PSI43 Test stand. Click here

  • PSI43 Documentation. Click here

  • My hitchhikers guide to  the PSI43 test stand.Click here


  • epp_line.gif (2537 bytes)

    This page was last edited on  14/07/03 12:51 by Alick